Legal / Contract Lifecycle Live

Contract Drafting

Draft an agreement from your own clause library, then check it against a completeness checklist and repair anything missing.

About the Agent

Challenges Contract Drafting addresses

Done by hand, contract lifecycle means gathering deal terms and anything else, working through 5 separate passes over the same material, then producing draft validation, draft agreement and completeness checklist. None of it is difficult and all of it is exacting, which is the combination people are worst at holding. The errors that matter are the ones a tired reader does not notice, and they surface later — in a reconciliation, or in somebody’s reply. It waits until someone remembers it, which is usually the point at which it has become urgent. As volume grows the work does not get harder, only longer, and the first thing to go is the checking.

Contract Drafting runs that same sequence end to end and returns the result as structured artefacts. What it cannot settle it hands over rather than guesses at, and your correction is kept: it asks “Is this draft usable?” after every run, and those answers become the set it is measured against. Nothing that moves money, alters a contract or reaches a customer executes without human approval, and every action is written to an audit log. The gain is in the volume that no longer has to be read, not in removing the judgement.

How it works

Step 1: Pulling clauses from your library

First of 5. It works from deal terms and anything else and feeds the step after it.

Key Tasks:

  • Working from the run so far: This step takes deal terms and anything else and carries it toward step 2.
  • Following the same rules each time: The behaviour is configuration rather than judgement made fresh per run, so contract lifecycle is handled the same way every time.
  • Surfacing what it cannot settle: Anything ambiguous is passed on as ambiguous rather than resolved silently.

Outcome:

  • Passed on: The result passes to the next step, with anything unresolved carried forward as an open item rather than dropped.

Step 2: Drafting the agreement

Step 2 of 5. It takes what step 1 produced and hands its result to step 3.

Key Tasks:

  • Writing from the run, not from a template: The text is built from what this run actually found, so two contract lifecycle outputs differ where the underlying records differ.
  • Leading with what needs a decision: The exceptions come first and the routine detail follows, because the reader is deciding rather than reading.
  • Staying inside the evidence: Nothing appears in the text that is not supported by a record the run examined. Gaps are stated as gaps.

Outcome:

  • Artefact ready: A finished artefact, traceable line by line to the records behind it, ready for a person to accept or correct.

Step 3: Checking the draft is complete

Step 3 of 5. It takes what step 2 produced and hands its result to step 4.

Key Tasks:

  • Running the checks in order: Every rule for contract lifecycle is applied to every record, in the same order each run. A record is not skipped because it looks routine.
  • Recording evidence, not verdicts: Each check stores what was expected and what was found, so a failure can be understood without re-running anything.
  • Separating clear from unclear: A check the agent cannot settle is marked unresolved rather than passed, which keeps "checked" meaning checked.

Outcome:

  • All checks pass: The record clears with its evidence attached, available if anyone asks later.
  • A check fails: The record is held with the failing checks named and the rest shown as passed, so a reviewer sees the scope of the problem rather than only that there is one.

Step 4: Deciding whether a repair pass is needed

Step 4 of 5. It takes what step 3 produced and hands its result to step 5.

Key Tasks:

  • Handling whether a repair pass is needed: The work at this step is whether a repair pass is needed, scoped to that and not extended to anything the run has already settled.
  • Leaving the record behind it: What this step did and what it decided are written down, so the result can be traced without re-running the step.
  • Working from the run so far: This step takes what step 3 produced and carries it toward step 5.

Outcome:

  • Whether a repair pass is needed handled: The result passes to the next step, with anything unresolved carried forward as an open item rather than dropped.

Step 5: Producing the completeness checklist

Last of 5. It takes what step 4 produced and produces draft validation and draft agreement.

Key Tasks:

  • Testing the completeness checklist: The rules applied here are the ones that govern the completeness checklist, rather than a general validity check that would pass anything well-formed.
  • Failing loudly, not quietly: A rule that cannot be evaluated is reported as unevaluated. A check that silently passes when it could not run is worse than no check.
  • Running the checks in order: Every rule for contract lifecycle is applied to every record, in the same order each run. A record is not skipped because it looks routine.

Outcome:

  • Within policy: The item satisfies every rule that governs it and continues without review.
  • Outside policy: The failing rules are named alongside the ones that passed, so a reviewer sees the scope of the problem rather than only that there is one.

Step 6: Your review, and what it changes

The run ends with a person, not with a result being filed.

Key Tasks:

  • Asking a specific question: It asks “Is this draft usable?” rather than for a rating. A question about this run is answerable; a score out of five is not.
  • Keeping the correction: What you change is recorded against the case that produced it, so the disagreement is retrievable rather than absorbed.
  • Building the evaluation set: Those cases become what the agent is measured on. It is scored against your judgement rather than against a general benchmark.

Outcome:

  • A measured agent, not an assumed one: The cases Contract Drafting handles well and the cases it does not are both visible, and the second list is the one that decides what changes. Nothing is retrained silently on the back of a single correction.

Why use Contract Drafting?

  • Answers from your own material: It retrieves from a knowledge base you populate — your policies, contracts and reference documents — so its decisions follow how your business actually operates rather than a general model’s assumptions. Sources are cited alongside the result.
  • Every statement cites its source: Findings come back with the records behind them, so a reviewer can check a claim instead of deciding whether to trust it. An assertion with no source is the expensive kind to discover late.
  • Checks are evidenced, not asserted: Each check records what was expected and what was found. A failure can be understood — and argued with — without re-running anything.
  • Corrected by the people using it: After each run it asks “Is this draft usable?”. Those answers become the evaluation set, which means it is measured against your judgement rather than ours.
  • Reads and reports, does not act: It returns a result for review rather than writing changes back on its own. Anything that moves money, alters a contract or reaches a customer needs human approval first.

Oversight

Runs under scoped, least-privilege credentials with every action written to an audit log. Anything that moves money, alters a contract or reaches a customer requires human approval before it executes.

Contract Lifecycle

Other agents in contract lifecycle

Contract review and clause-level risk checks

  • Contract Review Live

    NDA Analyzer

    Review one or more NDAs against a standard clause checklist, with risk levels and the quoted text behind each rating.

    View agent Book a call

Next Step

Deploy Contract Drafting, or adapt it

It runs as-is. Most deployments diverge — a different source system, a different tolerance, a different approval path. A 30-minute technical call establishes which.

Book a Technical Call
  • No sales script
  • NDA on request
  • Scoping notes sent within 48 hours
Call us Book a call