Sales / Contract Negotiation Live
Audit Readiness Retrieval
Answer an auditor's question from your contract archive, with every statement traced to the clause it came from — and an explicit list of what the archive does not answer.
About the Agent
Challenges Audit Readiness Retrieval addresses
Done by hand, contract negotiation means gathering the auditor's question and response settings, working through 3 separate passes over the same material, then producing can the archive answer this?, response and what the archive shows. None of it is difficult and all of it is exacting, which is the combination people are worst at holding. The errors that matter are the ones a tired reader does not notice, and they surface later — in a reconciliation, or in somebody’s reply. It waits until someone remembers it, which is usually the point at which it has become urgent. As volume grows the work does not get harder, only longer, and the first thing to go is the checking.
Audit Readiness Retrieval runs that same sequence end to end and returns the result as structured artefacts. What it cannot settle it hands over rather than guesses at, and your correction is kept: it asks “Would you send this to an auditor?” after every run, and those answers become the set it is measured against. Nothing that moves money, alters a contract or reaches a customer executes without human approval, and every action is written to an audit log. The gain is in the volume that no longer has to be read, not in removing the judgement.
How it works
Step 1: Searching the contract archive
First of 3. It works from the auditor's question and response settings and feeds the step after it.
Key Tasks:
- Covering the whole set: Every record in scope is examined, not a sample. That is the difference between a run and a spot check.
- Judging relevance by content: Whether something belongs in this run is decided from what it says rather than from where it was filed or how it was named.
- Discarding visibly: What is excluded is recorded as excluded, so "nothing found" can be distinguished from "nothing looked at".
Outcome:
- Relevant items found: They pass to the next step with the reason they were selected attached.
- Nothing relevant: The run reports that it found nothing and stops, rather than producing an empty artefact that reads like a failure.
Step 2: Answering from the archive
Step 2 of 3. It takes what step 1 produced and hands its result to step 3.
Key Tasks:
- Working from the run so far: This step takes what step 1 produced and carries it toward step 3.
- Following the same rules each time: The behaviour is configuration rather than judgement made fresh per run, so contract negotiation is handled the same way every time.
- Surfacing what it cannot settle: Anything ambiguous is passed on as ambiguous rather than resolved silently.
Outcome:
- Passed on: The result passes to the next step, with anything unresolved carried forward as an open item rather than dropped.
Step 3: Writing the response
Last of 3. It takes what step 2 produced and produces can the archive answer this? and response.
Key Tasks:
- Writing from the run, not from a template: The text is built from what this run actually found, so two contract negotiation outputs differ where the underlying records differ.
- Leading with what needs a decision: The exceptions come first and the routine detail follows, because the reader is deciding rather than reading.
- Staying inside the evidence: Nothing appears in the text that is not supported by a record the run examined. Gaps are stated as gaps.
Outcome:
- Artefact ready: A finished artefact, traceable line by line to the records behind it, ready for a person to accept or correct.
Step 4: Your review, and what it changes
The run ends with a person, not with a result being filed.
Key Tasks:
- Asking a specific question: It asks “Would you send this to an auditor?” rather than for a rating. A question about this run is answerable; a score out of five is not.
- Keeping the correction: What you change is recorded against the case that produced it, so the disagreement is retrievable rather than absorbed.
- Building the evaluation set: Those cases become what the agent is measured on. It is scored against your judgement rather than against a general benchmark.
Outcome:
- A measured agent, not an assumed one: The cases Audit Readiness Retrieval handles well and the cases it does not are both visible, and the second list is the one that decides what changes. Nothing is retrained silently on the back of a single correction.
Why use Audit Readiness Retrieval?
- Answers from your own material: It retrieves from a knowledge base you populate — your policies, contracts and reference documents — so its decisions follow how your business actually operates rather than a general model’s assumptions. Sources are cited alongside the result.
- Every statement cites its source: Findings come back with the records behind them, so a reviewer can check a claim instead of deciding whether to trust it. An assertion with no source is the expensive kind to discover late.
- Checks are evidenced, not asserted: Each check records what was expected and what was found. A failure can be understood — and argued with — without re-running anything.
- A batch is one run, not a hundred: It works the whole set in a single pass and returns a row per item with its verdict, so the volume that needs no attention never has to be opened.
- Corrected by the people using it: After each run it asks “Would you send this to an auditor?”. Those answers become the evaluation set, which means it is measured against your judgement rather than ours.
Oversight
Runs under scoped, least-privilege credentials with every action written to an audit log. Anything that moves money, alters a contract or reaches a customer requires human approval before it executes.
Contract Negotiation
Other agents in contract negotiation
Pipeline, proposals, renewals and the CRM hygiene underneath them
-
Check that every executed agreement is archived, that the archived copy is the executed one, and that nothing is superseded without its replacement on file.
View agent Book a call -
Generate a contract from your own approved clause library and the agreed deal terms, then check the result for anything missing or non-standard before it leaves your hands.
View agent Book a call -
Before a contract risk assessment starts, check whether the data it needs is actually there — which fields are complete, which are stale, and what cannot be assessed yet.
View agent Book a call -
Upload a non-standard deal and get it checked against your approval matrix — which exceptions it contains, who has to sign off, and a routing message drafted for that approver.
View agent Book a call -
Upload an agreement and get it checked against your own contracting standards — which required protections are missing, which are weaker than standard, and what to ask for.
View agent Book a call -
Summarise the non-standard terms a reviewer is being asked to accept, what each one exposes, and which have precedent — so a review takes minutes rather than an afternoon.
View agent Book a call
Next Step
Deploy Audit Readiness Retrieval, or adapt it
It runs as-is. Most deployments diverge — a different source system, a different tolerance, a different approval path. A 30-minute technical call establishes which.